Home/Products/60 Ton Cement Bulker Unloading System

60 Ton Cement Bulker Unloading System

Approx. price from source listing: Rs 1,30,000 / PieceGet Latest Price

60 Ton Cement Bulker Unloading System industrial roots blower

Product Overview

Product Details: A 60 Ton Cement Bulker Unloading System is a high-capacity pneumatic conveying system designed to efficiently and safely unload cement, fly ash, or similar powdered bulk materials from road bulkers (tankers) into storage silos. This system is built for continuous, dust-free operation and is powered by a twin-lobe Roots blower or similar air delivery unit. To unload a 60-ton cement bulker in approximately 60–90 minutes, depending on: Pipe length Blower capacity Material flow characteristics Silo height A Roots blower generates high-volume, low-pressure air (up to 1 bar). This air is supplied to the bulker via an aeration system inside the tanker. The cement is fluidized and pushed through the delivery pipeline toward the storage silo using the compressed air. The system includes valves, gauges, filters, and safety devices to ensure smooth, safe operation. Cement Plants Ready-Mix Concrete (RMC) Plants Fly Ash Handling at Thermal Power Plants Construction Sites Bulk Material Terminals Efficient unloading of large-capacity bulkers Dust-free operation enhances site cleanliness and safety Low maintenance and simple design Suitable for continuous duty Customizable for different bulker types and site layouts No material contamination – oil-free air deliver

Technical Parameters

Parameter DescriptionSpecification Rating
Minimum Order Quantity2 Piece
Airflow50–200 m³/hr
Material HandledCement - Fiy Ash - Lime Powder
Lifting Capacity60 Ton
Pressure0.3–0.5 bar
Unloading Capacity600-900 m3/hr
Lobe TypeTwin Lobe
Blower Power37 kW
Cooling MethodAir Cooled
System TypePneumatic
Motor Power10 HP
Mounting TypeTrolley Mounted
ApplicationCement Plant, Bulk Terminal, Fly Ash Silo, Silo Feeding, RMC Plant
Maximum Lifting Height30 ft
Power Supply440V
MaterialCast Iron.60 Ton Cement Bulker Unloading System
TypeRotating
Warranty12 months
Country of OriginMade in India
Cast IronCast Iron / SG Iron.60 Ton Cement Bulker Unloading System
Three phase33 KW.60 Ton Cement Bulker Unloading System
ComponentSpecification
Roots BlowerTwin-lobe type, 30–60 HP motor depending on pipe length and height
Electric Motor / Engine3-phase electric motor (standard) or diesel engine (mobile use)
Base Frame/SkidHeavy-duty, vibration-free
Air Receiver TankOptional – for storing and stabilizing compressed air
Inlet & Outlet SilencersTo reduce noise
Relief ValvePrevents overpressure in the line
NRV (Non-return Valve)Prevents backflow of material
Pressure GaugeFor monitoring line pressure
Aeration Pads or ConesInside the bulker for cement fluidization
Flexible Hose / PipingHeavy-duty, abrasion-resistant
Butterfly / Ball ValvesFor isolation and flow control
Silo AccessoriesTop-mounted dust collector, PRV, level indicators
ParameterValue
Unloading Capacity40–60 TPH (tons per hour)
Operating Pressure0.6 – 1.0 bar (g)
Motor Power40–60 HP
Conveying DistanceUp to 50–100 meters horizontally, 15–25 meters vertically
Power Supply3-phase, 415V, 50 Hz (for electric version)
MountingSkid-mounted or mobile trolley-mounted

Standard Application Spheres

Cement Plant, Bulk Terminal, Fly Ash Silo, Silo Feeding, RMC Plant

Frequently Asked Technical Questions

Q:What is the warranty and expected design lifespan of the 60 Ton Cement Bulker Unloading System?

Shree Ambika Engineering provides a comprehensive 12-month manufacturer warranty. Built with precision CNC-machined alloy steel timing gears and heavy-duty spherical roller bearings, our blowers feature an operating design lifespan exceeding 50,000 hours with standard preventative maintenance.

Q:Is the air delivered by 60 Ton Cement Bulker Unloading System 100% oil-free?

Yes. All SAE positive displacement Roots blowers guarantee 100% oil-free air delivery certified for sensitive processes such as biological wastewater aeration, food powder conveying, and cleanroom air systems. Dual labyrinth seals and atmospheric breather vents physically isolate gear oil from the compression chamber.

Q:Can 60 Ton Cement Bulker Unloading System be exported to Dubai, UAE, Saudi Arabia, and other GCC countries?

Yes, SAE actively exports across the Middle East. We equip units with dual 50Hz/60Hz motors, IP55/IP65 ingress protection, and high-ambient heat dissipation jackets tested for 50°C+ ambient temperatures. Shipments include Certificate of Origin, SASO/Saber compliance, and sea-worthy export crating directly to Jebel Ali and Dammam ports.

Q:What is the standard delivery timeline for 60 Ton Cement Bulker Unloading System?

Standard bare-shaft and skid-mounted configurations are stocked for immediate dispatch (within 24 to 48 hours) from our Vatva GIDC facility in Ahmedabad. Customized assemblies and export orders are dispatched within 7 to 10 working days.

Request Technical Quote